Through our maintenance and commercial contracts with the MOTO motorway services we installed new signage, barriers, tarmac, retaining walls and disabled ramp. We had to remove existing tarmac ramps to the entrance of the Service Station, install two concrete retaining walls to allow the the metal steps to be fixed to the disable ramp. Supply and install large pad foundation for the metal disabled ramps to be installed upon, along with foundations for the large signage and new barriers. All works was completed two weeks before due date as minimal disruption to the business as possible.